DX100 long-term sampling system integration into an Arctic shelter

DX100 long-term sampling system integration into an Arctic shelter

Back to NEWS The Best Available Techniques Conclusion for Waste Incineration plants (hereafter – BAT) came into effect at the end of 2023. The BAT for monitoring states: the sampling for dioxins, furans, and PCB-like dioxins should be done using a long-term sampling...